Ilmar MansurovAll case studiesRU

WMS and Operations

Kitchen in the order flow

Integrated kitchen work into the wider order flow across different production models.

Context

Cooks needed to see the dish queue, take orders into production, assign an owner, and handle items that could not be prepared. Batch baking required a separate journey.

−10% assembly time · +0.05% GMV · experiment in 8 stores

My role

I designed the queue, production states, ingredient view, assignee flow, cancellation reasons, and a separate batch-baking journey.

What I did

I covered the real physical operation end to end, from a dish entering the queue to printing two labels for the item and delivery bag.

Outcome

The experiment across eight stores reduced assembly time for kitchen orders by 10% and showed a 0.05% increase in GMV. Both results apply to the experimental sample.